Field experience

Case studies

Three equipped sites, three different questions. Each case study covers the context, the system, the support provided and the decisions the data made possible, along with the limits of the exercise.

SPL Trigironde

Sorting facility for separately collected recyclables, Saint-Denis-de-Pile (Gironde)

Measuring to guide investment

How can we identify the materials that can still be recovered from the rejects, and explore recovery options?

1 measurement pointthe rejects line, upstream of manual sorting

SPL Allier Tri

Sorting facility for separately collected recyclables, Chézy (Allier)

Objective data for better dialogue

How can the renewal of an operating contract be prepared using reliable, independent data?

2 measurement pointsthe infeed and the rejects before the picking cabin, in addition to less than 10 t characterised by hand each year

What links these three sites

Same method, different decisions

Continuous data, alongside sampling

The analyser continuously observes the items visible on the line, alongside manual characterisations, which only cover a few tonnes a year.

Calibrated data

At each site, the automated readings are compared with manual characterisations, using the site’s own grid.

An informed decision

Invest, postpone, manage differently: the measurement does not push towards one answer, it gives you the means to choose.

Discover our method

Your site could be next.

A 30-minute call to scope your challenges and identify the right measurement points.